850 Building Group, LLC, Custom Homes, Spec, Remodel Homes

Call us! (850) 642-7500

CUSTOM JAVASCRIPT / HTML
Remodeling Pricing Guide
We know what a big undertaking most remodeling projects can be. That’s why we won’t prescribe “quick-fixes” or use shoddy building materials. Getting it right takes time. It’s just that simple. We wouldn’t have it any other way.

Pricing can vary greatly on a project-by-project basis, largely depending on your budget and details of your finishes. During our initial discussion, we’ll tell you what ideas will work and what won’t. We gladly share costs and ideas to help you get what you want.

Take a look at the figures below to gain a better feel of what some of our lower and higher-end projects cost. 

**Remember, these are merely estimates based on past work we’ve completed. Every project is unique, and so are their relative costs.

KITCHENS
Basic Level

Large (35-40 LF) - $60k+
Medium (30-35 LF) - $45k+
Small (25-30 LF) - $35k+

  •  Use existing cabinet layout
  •  Existing flooring remains
  •  Appliances remain
  •  No location changes to electric, plumbing or AC
  •  Level 1 new cabinets
  •  Level 1 new plumbing fixtures
  •  Level 1 granite countertops
  •  Level 1 ceramic tile backsplash
  •  Painting kitchen walls/trim
  •  New light fixtures
Mid Level

Large (35-40 LF) - $75k+
Medium (30-35 LF) - $60k+
Small (25-30 LF) - $50k+

  •  Minor cabinet layout changes
  •  Level 1 new flooring
  •  Appliances remain but some moved
  •  No location changes to electric, plumbing or AC
  •  Level 2 new cabinets
  •  Level 2 new plumbing fixtures
  •  Level 2 granite countertops
  •  Level 2 ceramic tile backsplash
  •  Painting kitchen walls/trim
  •  New light fixtures
Upper Level

Large (35-40 LF) - $95k+
Medium (30-35 LF) - $75k+
Small (25-30 LF) - $65k+

  •  Major cabinet layout changes
  •  Level 2-3 new flooring
  •  New appliances in new locations
  •  Some location changes to elec, plumbing or AC
  •  Level 3 or custom new cabinets
  •  Level 3 new plumbing fixtures
  •  Exotic granite, marble or quartz countertops
  •  Level 3 tile or stone backsplash
  •  Painting kitchen walls/trim
  •  New light fixtures
NOT INCLUDED:
Permit fees
Structural changes
Electrical wiring upgrades
Drywall work
Trim work
Foundation work
BATHROOMS
Basic Level

Large M-Bath - $50k+
Small M-Bath - $35k+  
Hall Bath - $25k+

  •  Keep existing tub
  •  New tile floors and shower walls
  •  Level 1 plumbing fixtures
  •  Level 1 vanity cabinet
  •  Level 1 granite vanity top
  •  Minor electrical updates
  •  No shower glass enclosure
  •  All fixtures remain in same locations
  •  Painting bath walls/trim
  •  New light fixtures
Mid Level

Large M-Bath - $60k+
Small M-Bath - $45k+
Hall Bath - $30k+

  •  Replace existing tub
  •  New tile floors and shower walls
  •  Level 2 plumbing fixtures
  •  Level 2 vanity cabinet
  •  Level 2 granite or quartz vanity top
  •  electrical changes/updates
  •  shower glass enclosure
  •  All fixtures remain in same locations
  •  Painting bath walls/trim
  •  New light fixtures
Upper Level

Large M-Bath - $75k+
Small M-Bath - $60k+
Hall Bath - $40k+

  •  Replace existing tub with walk-in shower
  •  new tile floors and tile shower
  •  Level 3 plumbing fixtures
  •  Level 3 vanity cabinet
  •  Level 3 granite or quartz vanity top
  •  Electrical changes/updates
  •  Shower glass enclosure
  •  Fixtures locations may change
  •  Painting bath walls/trim
  •  New light fixtures
NOT INCLUDED:
Permit fees
Structural changes
Electrical wiring upgrades
Drywall work
Trim work
Foundation work
Whirlpool Tub
Want a quote more tailored to your exact needs?
Fill out the short form below, or call (850) 642-7500 for a consultation
850 Building Group, LLC ©2018
Santa Rosa Beach, FL 32459
Lic # CBC-1254315

https://www.facebook.com/850BG/   https://www.linkedin.com/company/850-building-group-llc/